发信人: haoyuan (@bdwm), 信区: ASCIIart
标 题: Re: 问题1
发信站: 四川大学蓝色星空站 (Sun May 10 22:39:56 2009), 站内
最近一般一幅画从构思到第一稿完成大概两三个小时吧,我觉得自己挺慢的,
当初画水乡·夏用了差不多一整天的时间别的什么事情也没干成。。。
第一稿完成以后基本不会有太多改动。
我昨天就说自己跟落玉是一个“流派”的,
通常系统画作会第一时间扔到美工版面挨上几砖再改。
【 在 sophia0326 ((>^ω^<)喵) 的大作中提到: 】
: haoyuan殿 一般一幅画作画多久?
: 画出来之后会经常改动么 还是基本就定型了?
--
Sender: haoyuan @bdwm , message area: ASCIIart
Title: Re: Question 1
Sending station: Sichuan University Blue Star Station Sun May 10 22:39:56 2009, within the station
Recently, it usually takes about two or three hours for a painting to be completed from the conception to the first draft. I feel that I am quite slow.
Xia spent almost a whole day painting the water town and didn't accomplish anything else.
After the first draft is completed, there will basically not be many changes.
I said yesterday that I and Luo Yu belong to the same school.
Usually the system drawings will be thrown into the art layout immediately and then modified after a few bricks.
Mentioned in sophia0326 >^ω^< meow’s masterpiece:
: Haoyuan Palace How long does it usually take to paint a painting?
: Will you change it often after you draw it, or is it basically finalized?